Hygienised Organic Cow Bedding Material (Manure-Derived) , Composting Equipment

Customization: Available
After-sales Service: 0086 400 6053 365
Type: Fecal Treatment Equipment

Product Description

Overview
Model NO.
WCDL-3
Usage
Fecal Dehydration Fermentation
Application
Cow
Power Source
Electric
Heating Type
Air Duct
Epidemic Prevention
Aerobic Fermentation
Computerized
Computerized
Certification
ISO9001:2008
Warranty
2 Years
Body Dimensions
18m x 3m x 2.8m
Power
24kw/35kw
Origin
China
Packaging & Delivery:
Package Size: 600.00cm * 260.00cm * 310.00cm
Package Gross Weight: 8500.000kg
Product Description

The bedding material production system is an efficient system independently developed to separate undigested fibrous matter from cow manure as organic bedding. The system, consisting of a spiral extruder separator and a set of drums, enables the production of fresh organic litter on the farm every day, with a minimum of 48 cubic meters of litter.

Produced and developed with international automation technology, the aerobic fermentation process is carried out at 60-75 °C, with a fermentation time of 8-36 hours. The system requires no external heat source; the biological process is monitored by temperature sensors, and the air flow is adjustable. This organic bedding is a guarantee for cow health and increased milk production.

Organic Cow Bedding Equipment

12m-30m (700-1000 cows)

Composting Equipment

18m-45m (1500-2000 cows)

System Comparison

Traditional Bedding Bedding Production System
Microbial load level is unclearReduced microbial load in the environment
Rapid equipment wear and tearSmall equipment wear and tear
Supply not guaranteedContinuous supply of raw materials
Padding cannot be processedEasy to use and handle
High storage costsEconomy and Environmental Protection
High purchase costCircular use
High labor intensityLow workload
---Improved comfort and health of cows
Product Parameters
Standard yield Specification Notes
Operating temperature in the drum 60-75 ºC ---
Fermentation time 8-36 hours Depends on manure management
Litter yield 12-30 30m³/day Maximum value yield
18-45 45m³/day
Detailed Photos

System Subject Overview

System Subject

Fecal Solid-Liquid Separator

Solid-Liquid Separator
Feed motor

Feed Motor

Drive motor

Drive Motor

Temperature sensor

Temperature Sensor

Equipment View 1 Equipment View 2
Company Profile

Our company is a high-tech enterprise specialized in the design and construction of modern livestock farms, and the production and sales of breeding and manure treatment equipment. We specialize in the production of dairy farm equipment including headlocks, barns, fans, cattle brushes, spray systems, manure scrapers, and bedding material production systems.

With 24 national patented technologies, our research focus remains on efficient, practical, durable, and energy-saving solutions to meet the needs of the rapidly developing dairy industry. Our sales network covers more than 10 provinces and autonomous regions, winning trust through high quality and performance.

FAQ
Are you a factory or trading company?
We are a professional and comprehensive dairy farm equipment supplier integrating R&D, production and sales.
May I visit your factory?
Sure, we warmly welcome you to visit our company. We can arrange pickups at the airport and station.
Can you guarantee your quality?
Of course. We have about 20 years of experience in this field with skillful production, good workmanship, and strict QC.
What products can I buy from your company?
Dairy farm equipment such as ventilation fans, cow headlocks, manure scrapers, bedding recovery systems, and manure separators.
What is the fermentation temperature of the bedding system?
The aerobic fermentation process is carried out at 60-75 °C to ensure the elimination of harmful microbes.
How long does the fermentation process take?
The fermentation time typically ranges between 8 to 36 hours, depending on how the manure is managed.

Related Products